STAR CONTRACTORS – Princes Risborough
CS Drylining Ltd. collaborated with Star Contractors on the Princes Risborough development project, delivering a collection of 24 new houses. Our expertise in a range of interior and exterior finishes ensured the creation of high-quality, comfortable, and modern homes, ready for their new residents.
Scope of Work:
- Drylining: Shaping the interiors of 24 new houses, expertly installing drywall to create defined living spaces.
- Plastering: Ensuring a flawless finish with the meticulous application of plaster, preparing walls and ceilings for a final decorative touch.
- Suspended Ceilings: Balancing form and function by installing suspended ceilings to streamline maintenance and enhance visual appeal.
- Screeds: Guaranteeing a stable base for flooring with expertly laid, high-quality screeds.
- Render: Applying a durable and aesthetically pleasing external finish for a polished and weather-resistant facade.
![Star Contractors](https://csdrylining.co.uk/wp-content/uploads/2017/09/Star-Contractors.png)
Client
STAR CONTRACTORS
Category
NEW BUILD
![UNITED LIVING – St Peters Phase 2 – Silverlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Princes Risborough](https://csdrylining.co.uk/wp-content/uploads/2024/04/Princes-Risborough-min.png)
![UNITED LIVING – St Peters Phase 1 – Greenlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Dee Park](https://csdrylining.co.uk/wp-content/uploads/2024/04/Dee-Park-1-510x382.jpg)
![STAR CONTRACTORS – Ashford Depot](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ashford-Depot-4-510x382.jpg)
![UNITED LIVING – Ravensbury Park Phase 1](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ravensbury-Park-510x382.jpeg)
![STAR CONTRACTORS – Trimmer Walk](https://csdrylining.co.uk/wp-content/uploads/2024/04/Trimmer-Walk-5-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Genome Campus Cambridge](https://csdrylining.co.uk/wp-content/uploads/2024/04/ESS-Genome-510x382.jpg)
![UNITED LIVING – Rhodes Moorhouse Court](https://csdrylining.co.uk/wp-content/uploads/2024/04/Moorhouse-min-510x382.jpeg)
![STAR CONTRACTORS – Harrow Homes](https://csdrylining.co.uk/wp-content/uploads/2024/04/Harrow-Homes-2-510x382.jpg)
![UNITED LIVING – Sparrow Farm](https://csdrylining.co.uk/wp-content/uploads/2017/10/United-Living-Sparrow-Farm-510x382.jpeg)
![LIFE BUILD – North Watford Police Station, Watford Community Housing](https://csdrylining.co.uk/wp-content/uploads/2017/10/Life-Build-NWPS-3-510x382.jpg)
![STAR CONTRACTORS – Davenport Lodge](https://csdrylining.co.uk/wp-content/uploads/2017/10/Star-Contractors-Davenport-Lodge-4-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – University of Kent Science Hub](https://csdrylining.co.uk/wp-content/uploads/2017/10/University-of-Kent-Science-Hub-1-510x382.jpg)
![UNITED LIVING – Copley Close Phase 2](https://csdrylining.co.uk/wp-content/uploads/2017/10/Copley-Close-Phase-2-1-510x382.jpg)
![STAR CONTRACTORS – Hindu Temple](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hindu-Temple-4-510x382.jpg)
![UNITED LIVING – Hollymoore Lane](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hollymoore-Lane-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – Beaucroft Foundation School](https://csdrylining.co.uk/wp-content/uploads/2017/09/Beaucroft-School-1-510x382.jpg)
![STAR CONTRACTORS – Crematorium](https://csdrylining.co.uk/wp-content/uploads/2017/09/Crematorium-Main-510x382.jpg)
![UNITED LIVING – Copley Close Phase 4](https://csdrylining.co.uk/wp-content/uploads/2024/04/Copley-Close-Phase-4-1-min-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Walker Primary School](https://csdrylining.co.uk/wp-content/uploads/2024/04/Walker-Primary-1-510x382.jpg)