STAR CONTRACTORS – Ashford Depot
CS Drylining Ltd. partnered with STAR CONTRACTORS to bring the Ashford Depot development to life, delivering a mix of 6 houses and 32 apartments. Our expertise in a wide range of interior and exterior finishes ensured the creation of comfortable, stylish, and durable living spaces, ready to welcome new residents.
Scope of Work:
- Drylining: Defining interior spaces with expertly installed drywall, laying the groundwork for both houses and apartments.
- Plastering: Ensuring flawless finishes with smooth, polished surfaces, creating a refined ambiance within each home.
- Suspended Ceilings: Balancing aesthetics and functionality, concealing infrastructure while enhancing the visual appeal of rooms.
- Screeds: Providing a robust, level foundation with high-quality screed, creating a stable base for various flooring options.
- Render: Applying a weather-resistant and visually appealing finish to protect and enhance the development’s exterior.
![Star Contractors](https://csdrylining.co.uk/wp-content/uploads/2017/09/Star-Contractors.png)
Client
STAR CONTRACTORS
Category
NEW BUILD
![UNITED LIVING – St Peters Phase 2 – Silverlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Princes Risborough](https://csdrylining.co.uk/wp-content/uploads/2024/04/Princes-Risborough-min.png)
![UNITED LIVING – St Peters Phase 1 – Greenlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Dee Park](https://csdrylining.co.uk/wp-content/uploads/2024/04/Dee-Park-1-510x382.jpg)
![STAR CONTRACTORS – Ashford Depot](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ashford-Depot-4-510x382.jpg)
![UNITED LIVING – Ravensbury Park Phase 1](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ravensbury-Park-510x382.jpeg)
![STAR CONTRACTORS – Trimmer Walk](https://csdrylining.co.uk/wp-content/uploads/2024/04/Trimmer-Walk-5-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Genome Campus Cambridge](https://csdrylining.co.uk/wp-content/uploads/2024/04/ESS-Genome-510x382.jpg)
![UNITED LIVING – Rhodes Moorhouse Court](https://csdrylining.co.uk/wp-content/uploads/2024/04/Moorhouse-min-510x382.jpeg)
![STAR CONTRACTORS – Harrow Homes](https://csdrylining.co.uk/wp-content/uploads/2024/04/Harrow-Homes-2-510x382.jpg)
![UNITED LIVING – Sparrow Farm](https://csdrylining.co.uk/wp-content/uploads/2017/10/United-Living-Sparrow-Farm-510x382.jpeg)
![LIFE BUILD – North Watford Police Station, Watford Community Housing](https://csdrylining.co.uk/wp-content/uploads/2017/10/Life-Build-NWPS-3-510x382.jpg)
![STAR CONTRACTORS – Davenport Lodge](https://csdrylining.co.uk/wp-content/uploads/2017/10/Star-Contractors-Davenport-Lodge-4-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – University of Kent Science Hub](https://csdrylining.co.uk/wp-content/uploads/2017/10/University-of-Kent-Science-Hub-1-510x382.jpg)
![UNITED LIVING – Copley Close Phase 2](https://csdrylining.co.uk/wp-content/uploads/2017/10/Copley-Close-Phase-2-1-510x382.jpg)
![STAR CONTRACTORS – Hindu Temple](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hindu-Temple-4-510x382.jpg)
![UNITED LIVING – Hollymoore Lane](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hollymoore-Lane-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – Beaucroft Foundation School](https://csdrylining.co.uk/wp-content/uploads/2017/09/Beaucroft-School-1-510x382.jpg)
![STAR CONTRACTORS – Crematorium](https://csdrylining.co.uk/wp-content/uploads/2017/09/Crematorium-Main-510x382.jpg)
![UNITED LIVING – Copley Close Phase 4](https://csdrylining.co.uk/wp-content/uploads/2024/04/Copley-Close-Phase-4-1-min-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Walker Primary School](https://csdrylining.co.uk/wp-content/uploads/2024/04/Walker-Primary-1-510x382.jpg)