ESS EXTRA SPACE SOLUTION – University of Kent Science Hub
This project was more than a construction endeavor; it was an opportunity to contribute to the future of education and research. The Science Hub stands as a beacon of progress, embodying the University of Kent’s commitment to fostering an environment where learning and discovery converge. Our team’s dedication to excellence was paramount, ensuring that every aspect of our work supported the facility’s cutting-edge aspirations.
The modular extension represents a significant advancement in sustainable construction techniques, embodying flexibility, efficiency, and a minimized environmental footprint. Our drylining and tape & joint work within this space not only contributed to the overall aesthetic but also enhanced the acoustic properties and thermal efficiency of the classrooms and laboratories, creating an optimal learning environment.
Moreover, the lay-in grid suspended ceilings introduced an element of modern design and functionality, accommodating integrated lighting and ventilation systems that are essential for a state-of-the-art science hub. This attention to detail and innovation is a testament to our commitment to quality and sustainability, ensuring that the University of Kent Science Hub is not only a place of education but a showcase of forward-thinking construction practices.
New Build Modular School Extension; Drylining, Tape & Joint and Lay in grid Suspended Ceilings work package.
![University of Kent Science Hub 2](https://csdrylining.co.uk/wp-content/uploads/2017/10/University-of-Kent-Science-Hub-2-scaled.jpg)
Client
ESS EXTRA SPACE SOLUTION LTD.
Date
2019
Category
NEW BUILD
![UNITED LIVING – St Peters Phase 2 – Silverlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Princes Risborough](https://csdrylining.co.uk/wp-content/uploads/2024/04/Princes-Risborough-min.png)
![UNITED LIVING – St Peters Phase 1 – Greenlands](https://csdrylining.co.uk/wp-content/uploads/2024/04/St-Peters-510x382.jpeg)
![STAR CONTRACTORS – Dee Park](https://csdrylining.co.uk/wp-content/uploads/2024/04/Dee-Park-1-510x382.jpg)
![STAR CONTRACTORS – Ashford Depot](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ashford-Depot-4-510x382.jpg)
![UNITED LIVING – Ravensbury Park Phase 1](https://csdrylining.co.uk/wp-content/uploads/2024/04/Ravensbury-Park-510x382.jpeg)
![STAR CONTRACTORS – Trimmer Walk](https://csdrylining.co.uk/wp-content/uploads/2024/04/Trimmer-Walk-5-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Genome Campus Cambridge](https://csdrylining.co.uk/wp-content/uploads/2024/04/ESS-Genome-510x382.jpg)
![UNITED LIVING – Rhodes Moorhouse Court](https://csdrylining.co.uk/wp-content/uploads/2024/04/Moorhouse-min-510x382.jpeg)
![STAR CONTRACTORS – Harrow Homes](https://csdrylining.co.uk/wp-content/uploads/2024/04/Harrow-Homes-2-510x382.jpg)
![UNITED LIVING – Sparrow Farm](https://csdrylining.co.uk/wp-content/uploads/2017/10/United-Living-Sparrow-Farm-510x382.jpeg)
![LIFE BUILD – North Watford Police Station, Watford Community Housing](https://csdrylining.co.uk/wp-content/uploads/2017/10/Life-Build-NWPS-3-510x382.jpg)
![STAR CONTRACTORS – Davenport Lodge](https://csdrylining.co.uk/wp-content/uploads/2017/10/Star-Contractors-Davenport-Lodge-4-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – University of Kent Science Hub](https://csdrylining.co.uk/wp-content/uploads/2017/10/University-of-Kent-Science-Hub-1-510x382.jpg)
![UNITED LIVING – Copley Close Phase 2](https://csdrylining.co.uk/wp-content/uploads/2017/10/Copley-Close-Phase-2-1-510x382.jpg)
![STAR CONTRACTORS – Hindu Temple](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hindu-Temple-4-510x382.jpg)
![UNITED LIVING – Hollymoore Lane](https://csdrylining.co.uk/wp-content/uploads/2017/09/Hollymoore-Lane-510x382.jpg)
![ESS EXTRA SPACE SOLUTION – Beaucroft Foundation School](https://csdrylining.co.uk/wp-content/uploads/2017/09/Beaucroft-School-1-510x382.jpg)
![STAR CONTRACTORS – Crematorium](https://csdrylining.co.uk/wp-content/uploads/2017/09/Crematorium-Main-510x382.jpg)
![UNITED LIVING – Copley Close Phase 4](https://csdrylining.co.uk/wp-content/uploads/2024/04/Copley-Close-Phase-4-1-min-510x382.jpg)
![ESS/SPATIAL INITIATIVE – Walker Primary School](https://csdrylining.co.uk/wp-content/uploads/2024/04/Walker-Primary-1-510x382.jpg)